1. Fabrication & Erection, Sheeting, Of Boiler Structure as per drawing.
2. Mobilization of all the labour as per requirement.
3. Deployment of skilled and unskilled labor for Fabrication, Painting and Erection.
4. Deployment of housekeeping staff for maintenance of site and handing over of the scrap materials after completion of the project as per the standard Engineering practice.
5. Fabrication in all aspects of as per design and detail manufacturing drawings.
6. Inspection and testing as per code requirement.
7. Load test / Trail Run.